Centennial Park Trail Celebration

ROXBORO ROTARY CENTENNIAL PARK

Centennial Park
Trail Celebration.

More trails for everyone. A growing network built by a community that loves the outdoors.

Join TORC in Person County to celebrate the trails taking shape at Centennial Park, from woodland loops to a signature mountain-bike flow experience.

Explore the trail network
Saturday, November 14, 202610am – 2pmRoxboro, North CarolinaRain backup: Sunday, November 15

A CENTURY OF SERVICE. A NEW CHAPTER OF TRAILS.

Celebrate the miles.
And the people
behind them.

The story here is the trail network: a perimeter loop, purpose-built riding, and new connections that keep expanding the ways to explore.

Centennial Park honors the Rotary Club of Roxboro, founded in 1924, and its century of community service celebrated in 2024. The club’s investment in Person County’s Farm to Park project helps advance a place for hiking, biking and outdoor learning.

Person County owns and leads development of the park.

THE NETWORK IS GROWING

From a first loop
to a bigger adventure.

~ 12 miles

Expected completed network.
A planning estimate including the trails still being built.

On completion, this would be similar in scale to Brumley South’s approximately 11-mile bike-and-hike network, with Centennial’s own mix of woodland loops and purpose-built flow riding.

01
Established network

Firebreak

Firebreak forms the perimeter backbone. Pine Cone is hiking-only, and Drop Tine is another addition to the mapped network.

Firebreak trail outline~4.0 miMapped Firebreak loop
Part of the existing network
02
Established network

Wild Turkey

Wild Turkey adds a bike-only route to the woodland network.

Wild Turkey trail outline1.1 miWoodland trail
Part of the existing network
03
Completed

TORC flow & return trails

This pairing adds a one-way downhill flow line and a separate bidirectional multi-use return connection.

TORC flow and return trails3,500 ft2,032 ft flow + 1,468 ft return
Combined completed project length
04
Completed

Oscillation Loop

Completed in September, Oscillation Loop adds approximately 1.7 miles to Centennial Park’s growing trail network.

Oscillation Loop~1.7 miEstimated 1.65–1.75 miles
A new addition to the network
05
Under construction

Burton’s Loop

The planned 3.5-mile loop extends the network’s next chapter.

Burton’s Loop3.5 miPlanned scope
Included in the completed-network estimate

Mileage is an estimate for the completed network.

SEE THE CONNECTIONS

Diverse miles
of trail

Follow the perimeter. Find the flow. See where the network has taken shape.

This Person County reference map shows the trails mapped as of September 2026, with Oscillation and Burton’s Loop added.

  • FirebreakPerimeter route
  • Wild TurkeyBikes only
  • Pine ConeHiking only
  • TORC flow & returnFlow line + return connection
  • Drop TineMapped route
  • Oscillation Loop
  • Burton’s Loop
  • Gray linesAccess roads

Reference illustration, not a complete current-access map. The paved route and facility symbols do not confirm amenities are available. Follow posted trail-use signs.

View the reference map at full size ↗
Centennial Park trail map showing Firebreak, Wild Turkey, Pine Cone, TORC flow and return, Drop Tine, Oscillation Loop, and Burton’s Loop.

A SIGNATURE RIDING EXPERIENCE

Find rhythm.
Feel the flow.

Berms. Smooth rollers. A purpose-built line that rewards rhythm and controlled speed.

The completed TORC-funded flow trail brings a distinct kind of mountain-bike experience to the park. A separate return route reconnects riders with the network and offers shorter Firebreak loop options.

HOW THE PAIRING WORKS

Recorded flow trail and return line in an angled view.

2,032 ft One-way downhill flow

1,468 ft Bidirectional multi-use return

BUILT THROUGH PARTNERSHIP & STEWARDSHIP

One trail leads to the next.

By March 2026, Centennial Park was welcoming visitors in a soft-open phase with about six miles of rideable natural-surface trails. The completed flow and return project and Oscillation, along with planned Burton’s Loop, point to an expected completed network of about 12 miles — roughly doubling that early riding network.

Late 2025

The backbone

Firebreak’s perimeter loop completed.

By March 2026

An early chapter

Visitors could explore about six miles of rideable natural-surface trails in the soft-open phase.

Summer 2026

A new riding style

The flow and return project completed, alongside growth in the woodland network.

September 2026

Another connection

Oscillation completed, then ridden for review in October.

By November 2026

The next loop

Burton’s Loop is expected to be completed by November 2026, adding 3.5 miles to the network.

SATURDAY’S RIDE & ACTIVITY SCHEDULE

Come celebrate
the trail community.

Saturday, November 14, 2026
10am – 2pm
Roxboro Rotary Centennial Park
909 Stan’s Way, Rougemont

Rain backup: Sunday, November 15.

10am: Celebration begins.
10:15am: Fast group ride led by James Allen.
10:30am: Inclusive MTB ride with Danny Enzo; inclusive adaptive MTB ride with Wes Hall and NC Adapted Sports.
11am: Women’s-only ride led by Dani King.
Noon: Food trucks and jump practice with Sendit & Sons.
1pm: Group ride focusing on the flow trail and a jump freestyle event.
2pm: Event ends. Enjoy the park for the rest of the day!

Quick Links

Association members

Society of Outdoor Recreation ProfessionalsAmerican TrailsNorth Carolina Recreation & Park Association

Privacy Preference Center